Measuring and inspection systems for the curing area

Curing area

First tyre check and systematic tyre check are the last step of the tyre pressing process. Checking the correctness, completeness and quality of the text from the tyre bead, through the rim protector to the sidewall of the tyre is a necessary step to ensure production in accordance with the law and at the same time in accordance with quality requirements.

Checking the correctness of the tread pattern as well as the inner part of the tyre tread becomes an integral part of the first tyre check and systematic tyre check. This ensures that every tyre meets the highest quality standards before it leaves the production process.

logo

Fields of application

  • Letter inspection
Your request for: {product}
* Mandatory fields
We treat your data confidentially. Please read our data privacy statement.

Downloads